Installation

  1. Install all the necessary components

    1. Controller

    2. Session Host

    3. DVM Tools

    4. Hyper-V Connector

  2. Ensure Session Providers such as VMware (ESXi or vCenter Server), Microsoft (Hyper-V or SCVMM), Nutanix (Prism Element or Central) are already installed and ready for use.

  3. Make sure devices can connect to the HyWorks Controller on port 38866 and target DVM on port 3389.

  4. Refer Prepare Windows Desktop VM section and Prepare Linux Destop VM section for detailed instructions on prepare virtual machines for deployment in HyWorks Suite.